Ebara Right Pumps
Ebara Right 75 10m 400v 1771031404
In stock
- Established 1975
- Trusted by thousands of customers
Ebara Right Pumps
The single phase Right 75 400v from Ebara is a submersible dirty water pump made of stainless steel AISI 304, double mechanical seals ensure long life and reliability. Suitable for dirty water systems with some solids. Applications include wastewater treatment plants and final effluent pumping, irrigation, and water displays.
Specifications
- Maximum liquid temperature: 50°C
- Maximum immersion: 10 mts
- Maximum passage of solids: 35 mm
Materials
- Pump casing, impeller, cover, casing cover and motor casing in AISI 304
- Shaft in AISI 303
- Double mechanical seal with interposed oil chamber: upper in carbon/ceramic/NBR, lower in Sic/SiC/NBR
Technical Data
- Asynchronous 2 poles motor
- Insulation class F
- Protection degree IP68
- 3~, 400V +- 10%, 50Hz
- DNM 1”½
More about this product
- The EBARA RIGHT Range (3 Phase) are stainless steel three phase submersible. pumps Suitable for dirty water systems with some solids. Applications include waste-water treatment plants and final effluent pumping.
- Please note the 3 phase versions of the Ebara right range do NOT come with float switches.
-
data sheet PDFDownload
Standard delivery:
Standard delivery is free for all orders except for some low cost/low margin items where standard delivery is £6.50. Some difficult to transport goods also have a varying carriage charge applied.
Please contact us for the estimated standard delivery times of the products that we have in stock, either by calling 01473 719950, or by dropping us an email at info@anglianpumping.com.
Deliveries will typically be made between 7am and 6pm, Monday to Friday (excluding public holidays).
Next day delivery:
Next working day delivery is available for a £15.00 + vat delivery charge.
Orders must be placed before 12 noon to qualify for next working day delivery. Orders placed after 12 noon on Thursday but before noon on Friday will be delivered the following Monday. Orders placed after 12 noon on Friday will be delivered on Tuesday.